Waterproofing & Backfilling ICF Basement – PLFL Build
SERIES
2 Videos
ICF Walls are poured and we’re in a very vulnerable position now with the excavation at risk of sluffing or caving in at any time it’s important we get at least some preliminary backfilling complete. The walls need a few days to firm up so we’re moving on to installing a asphaltic waterproof membrane and dimple fabric.
Finally we add in load after load of washed drain rock to bring up the excavation to a less vulnerable state. Due to real time crunches we have move on to hit our deadline for the coming workshop so this is where the backfilling ends for now.