With the interior foundation grade compacted and level we’re moving on to getting the ground rough plumbing installed. This process will prove maddening due to the blistering sun warping the assembly and the inspector trying very hard to make our life difficult with no show inspections on Friday leaving things exposed till Monday.

We’re installing the sewer main, branch plumbing and the floor drains for the slab. We come to find out during this process that the water main which caused us so much grief with the footings is once again a pain in the rear and will need to be re-excavated and replaced. Let’s get plumbing!