2015-09-15 Trip to Panhandle Health.mov
play-rounded-fill

Septic Permit, Percolation Testing & Installation

SERIES

3 Videos

One of the first projects we tackled was getting a waste water treatment system installed. We decided that this was a service we’re better off contracting out due to lack of skill and major time constraints. At that moment we were anticipating getting a structure dried in for winter and it was already late summer.

Follow along with us as we go through the permitting process, digging the test holes for a percolation test and the system gets installed and connected to our RV.

Newest Streams

Timber Loft Stairs Project
Radiant Hydronic Subfloor Installation

Featured

Radiant Hydronic Subfloor Installation
Buying A Sawmill and Getting Logs
KERF-Featured-Image-SERIES-Timber-Frame-Workshop
Hide picture