Platform Floor Framing
SERIES
3 Videos
Sill plates are secure and we’re off and running on the first floor platform framing. For this stage we’re using I-Joist, LVL and LSL engineered products to build a strong, durable and rigid first floor platform where the timber frame will be placed.
Getting joists up on the platform with just two people was challenging using our only piece of equipment, the backhoe. Turns out a 36′ long i-joint is pretty wobbly and you breaking them isn’t a wise idea! Join us for framing our platform!